We use cookies to provide you with a better experience. By continuing to browse the site you are agreeing to our use of cookies in accordance with our Privacy Policy.
In 1941, the federal Aircraft Engine Research Laboratory set up shop in Cleveland, Ohio. This year, and several name changes later, what is now the NASA Glenn Research Center celebrates its 75th anniversary.
As part of the year-long festivities,
Glenn’s adjunct Lewis Field main campus will be open to the public May 21 and 22, and Plum Brook Station in Sandusky, Ohio will hold its open house June 11 and 12.
This three-part series on motor management best practices focuses on the importance of instituting a motor management plan as a necessity in effectively administering the electric motors in a facility. The goal of a motor management plan is to take advantage of opportunities for energy savings and increased productivity using energy efficient, reliable
motors such as NEMA Premium efficiency motors, herein referred to as “premium efficiency” motors.
As gear efficiency is improved in small steps, it is important to be able to distinguish actual improvements from scatter that can occur while testing. An FZG back-to-back gear test rig was used
to investigate how the assembly and re-assembly of the same test setup affects the measurements. A spread in torque loss between one assembly and another of the same test setup were observed. Rig conditions also affected the spread in input torque. With knowledge of how the spread in torque loss varies due to assembly, test results could be distinguished between changes due to assembly and
actual differences between tests.
Energy costs and downtime can be greatly reduced by instituting a motor management plan. Part II of this three-part series specifically addresses the establishment of a motor failure policy and the development
of purchasing specifications. Part I addressed the general aspects
of a motor management plan, including the first steps of creating a motor inventory and guidelines for motor repair and replacement. Part III will examine motor repair specifications
as well as preventive and predictive maintenance.
Reducing losses and increasing profits by instituting a motor management plan is what this series of articles is all about. Here in Part I, we discuss how to create a motor inventory and establish repair-or-replace motor guidelines. Subsequent topics in this
three-part series will address (Part II)
motor failure policies and purchasing
specifications, and (Part III) repair
specifications and preventive and predictive maintenance, respectively.
Tooth contact analysis (TCA) is an important tool directed to the determination of contact patterns, contact paths, and transmission errors in gear drives. In this work, a new general approach that is applicable to any kind of gear geometry is proposed.